Case Study: Sha Tin Methodist Secondary School

The Methodist Secondary School in Shatin required a large-footed projection system in the auditorium. The special feature of this project was that we needed to project the images onto the original 310-inch giant backplate as instructed by the school, and to get the ideal display throughout the auditorium. After an on-site inspection, our engineers recommended the Optoma CUL10K as the spindle for the complete solution, which has an amazing brightness of 10,000 lumens, which is enough to meet the needs of the project. Through the efforts of our professional engineering team, the installation of the whole project was successfully completed, and the school was quite satisfied with the display performance of the new projection system.

Related model: Optoma CUL10K

Shopping Cart